Stone Salon Update

Many of you have asked, "when will the new salon open?" The answer to that is 2017 but unfortunately we do not have an opening date as of yet. We are currently waiting for the lovely apartments above to be finished being built before we can have a better idea of when we will open. No one wants to open in a construction zone! As soon as we have an opening date we will be sending out emails as well as snail mail invitations!

Here are some recent shots of our exterior. Everywhere you see the Tyvek paper will have beautiful brick to match our pillars below. 

This is our front entrance on the corner of Stone and Rowley. Sorry my car is photo bombing! 

This is our front entrance on the corner of Stone and Rowley. Sorry my car is photo bombing! 

We have brick on our storefront pillars. I love the variation in color.  

We have brick on our storefront pillars. I love the variation in color.  

Our unit goes from the tree on the left to the tree on the right. We have a gorgeous corner unit :) 

Our unit goes from the tree on the left to the tree on the right. We have a gorgeous corner unit :) 

Now for some interior shots!!  We finally have drywall up on our ceilings. This ceiling is a 2 hour fire rated ceiling to protect our space if there was ever a fire above. After this layer, we will install additional electrical components and ductwork and then apply another ceiling below that, which will cover those beams as well.

We have our back wall installed with 2x4s separating our space from our neighbor's unit. We also have temporary walls up where our windows will go in while we wait for them to be fabricated. Now that the space is closed off to the outside environment, we can soon begin further interior renovations. I can't wait for drywall!

Panoramic shot. 

Panoramic shot. 

Front entrance. 

Front entrance. 

Back of the salon. 

Back of the salon.